The Complete Guide to Building an ADU in King County

Everything you need to know about ADU construction — laws, costs, permits, neighborhoods, and financing. Updated for 2026.

An Accessory Dwelling Unit (ADU) is a self-contained residential unit on the same lot as a primary home. Washington State's HB 1337 — combined with Seattle's landmark 2019 ADU reform (CB 119544 / Ordinance 125791) — has created the most favorable ADU-building environment in the region's history. Most residential lots across Seattle and King County can now support up to two ADUs with no owner-occupancy requirement.

This guide covers everything King County homeowners need to know: what types of ADUs exist, where you can build, what the rules are, how much it costs, and how to get started.

Types of ADUs in King County

Detached ADU (DADU)

A separate structure on your lot — backyard cottage, guest house, or standalone rental. Maximum privacy and rental value. Up to 1,000 sq ft per SMC 23.44.041.

$450K – $800K+ Learn more

Attached ADU

A unit built within or connected to your existing home — basement conversions, side additions, above-garage units. Lower infrastructure costs since you share structural elements.

$300K – $500K Learn more

Garage Conversion

Convert an existing garage into a permitted dwelling unit. The most affordable path. Existing structure conversions allowed even if the building doesn't meet current setback standards.

$200K – $325K Learn more

Basement ADU

Turn existing below-grade space into a rental-ready unit. In Seattle, basement conversions are classified as AADUs under SMC 23.44.025 with no additional lot coverage impact in most SF5000 zones.

$225K – $400K Learn more

Key Rules You Need to Know

Two ADUs Per Lot

Most residential lots in urban growth areas can support up to two ADUs in any configuration — two attached, two detached, or one of each. ADUs are exempt from density limitations.

Source: RCW 36.70A.680 / SMC 23.44.041/23.44.025

No Owner Occupancy

You are no longer required to live on the property. You can rent both your main home and your ADU(s) independently. This was eliminated statewide under HB 1337.

Source: RCW 36.70A.681(1)(b)

1,000 Sq Ft Minimum Floor

Local governments cannot set maximum ADU size below 1,000 sq ft. Cities can allow larger, but cannot restrict below this threshold.

Source: RCW 36.70A.681(1)(c)

Reduced Parking

No parking required if within ½ mile of a major transit stop. Link Light Rail and RapidRide service areas in Seattle and King County qualify.

Source: RCW 36.70A.681(1)(e)

Existing Structure Conversion

You can convert existing legal nonconforming structures (garages, barns) into ADUs even if they don't meet current setback or lot coverage standards.

Source: RCW 36.70A.681(1)(d)

Condo Ownership

ADUs may be sold as condominiums independent of the principal unit. The land stays with the primary homeowner, but the ADU structure can have separate ownership.

Source: RCW 36.70A.681(1)(g)

Shoreline Management Act Consideration

Properties within 200 feet of Lake Washington, Lake Union, Green Lake, or Puget Sound may require Shoreline Management Act (SMA) review. Unlike some environmental restrictions, the SMA does not prohibit ADU construction — but it adds 4–8 weeks and $5,000–$15,000 to the permitting process. Our feasibility study identifies SMA jurisdiction automatically.

Get a free feasibility study

What Does an ADU Cost?

ADU Type Cost Range
Garage Conversion $200K – $325K
Basement ADU $225K – $400K
Attached ADU $300K – $500K
Detached ADU (DADU) $450K – $800K+

Additional costs include permit and impact fees ($20K\u2013$50K), utility connections ($10K\u2013$30K), and site prep ($5K\u2013$20K). See full ADU cost breakdown for King County.

Ready to Get Started?

Get a free feasibility study to confirm your lot qualifies, or explore our ADU permitting service — your permit investment is applied as a build deposit.

Last updated: March 2026. This guide is for educational purposes only and does not constitute legal advice.

Fastest Way to a Walkthrough

Want Us Out to Walk Your Property?

The fastest way to get our team on-site is the free feasibility study. Eric gets your details by text the second you submit.

Book Free Walkthrough

Prefer to call? (206) 222-2898

(206) 222-2898 Book Free Walkthrough